RPI Low Center: Argeton Terracotta Rainscreen Recladding

Rensselaer Polytechnic Institute selected the Argeton terracotta rainscreen system to replace deteriorating brick veneer on the George M. Low Center for Industrial Innovation in Troy, New York. The recladding project gave the prominent nine-story building a durable, lightweight and low-maintenance exterior while preserving the visual character and architectural mass of the original structure.
The project presented a fitting engineering challenge for RPI, the nation’s oldest technological research university. After years of investigating the causes of the original brick façade’s deterioration, the university conducted an extensive comparison of metal panels, replacement brick veneer and terracotta rainscreen systems. The Argeton system supplied by Telling Architectural Systems was selected based on its performance, engineered substructure, material quality, technical support and ability to meet the project’s long-term service-life goals.
The George M. Low Center for Industrial Innovation
The Low Center for Industrial Innovation is one of the most prominent buildings on Rensselaer Polytechnic Institute’s campus. The nine-story concrete research facility was developed during the 1980s to support advanced research in manufacturing, computer graphics and integrated electronics.
The building is named for George M. Low, an RPI graduate who played an important role in the United States space program. Low served as manager of NASA’s Apollo Spacecraft Program Office following the Apollo 1 fire and directed the changes needed to make the spacecraft safe for future missions. He later became NASA Deputy Administrator before returning to RPI as the Institute’s 14th president.
The scale, height and location of the Low Center make it a dominant presence on campus. Its original brick veneer consisted of approximately 61 percent light-colored brick and 39 percent red brick, creating a varied exterior pattern across the massive structure. When portions of that veneer began to fail, the university needed a replacement system that could resolve the underlying performance problems while maintaining the building’s architectural importance.
Why Did the Original Brick Façade Need to Be Replaced?
By 1996, spalling of the Low Center’s light-colored brick had become a safety concern. Ryan-Biggs Associates, P.C. was commissioned in 1996 and again in 2005 to investigate the brick veneer and determine why the façade was deteriorating.
The investigation found that the light-colored bricks were highly absorptive and susceptible to cracking, spalling and continued expansion. Contributing conditions included insufficient relief space at relieving angles, thermally induced movement and water infiltration through cracks in the masonry. Freeze-thaw cycles accelerated the deterioration, particularly on the north façade above a heavily traveled pedestrian route. Safety netting was eventually installed to protect people walking near the building.
The findings demonstrated that localized repairs would not provide the reliable, long-term solution RPI needed. The university therefore began evaluating complete façade replacement systems that could improve moisture management, accommodate movement and provide an anticipated service life of approximately 50 to 60 years.
Comparing Brick, Metal Panels and Terracotta Rainscreen

In 2008, a project team consisting of Rensselaer Polytechnic Institute, architecture+ and construction manager VMJR Companies began analyzing replacement options for the Low Center. Drawing on façade investigations dating back to 1996, the team narrowed its evaluation to three primary alternatives: new brick veneer, metal wall panels and terracotta rainscreen cladding.
The team considered the architectural character of traditional clay, the scale and visual mass of the building, the performance of back-ventilated rainscreens, long-term maintenance requirements and the weight that could be supported by the existing structure. Terracotta rainscreen emerged as the preferred solution because it offered the appearance and permanence of a natural clay material within a comparatively lightweight, drained and ventilated wall system.
Before selecting a supplier, the project team spent approximately two years researching available terracotta systems, visiting completed buildings and reviewing large-scale mockups. Major suppliers were asked to provide formal proposals addressing system design, technical support, manufacturing experience, pricing and schedule capabilities.
Four finalists were interviewed and assessed through a detailed 23-point evaluation that considered each company’s support team, manufacturing capabilities, raw materials, experience and distinguishing system features. Following this extensive analysis, the project team selected the Argeton terracotta rainscreen system from Telling Architectural Systems.
Why Was Argeton Selected for the Recladding Project?
Argeton met the project’s requirements for a durable, lightweight and low-maintenance façade with the appearance of traditional clay. At approximately 11 pounds per square foot, the system satisfied the structural weight limitations associated with recladding the existing nine-story concrete building.
The system also supported the project team’s long-term performance objectives. Its kiln-fired terracotta tiles, aluminum subframing and mechanical attachment components were selected to provide a projected service life of approximately 50 to 60 years. Unlike painted cladding products, the natural terracotta finish does not depend on a field-applied coating to maintain its color.
The project team also placed significant value on the precision-engineered aluminum support system and the technical assistance available from Telling and Argeton. Because the work involved a large, occupied building and a multiphase construction schedule, coordination among the owner, architect, construction manager, supplier and installation team was essential.
How Was the New Terracotta Rainscreen Installed?
The existing brick veneer was removed and recycled as work progressed around the occupied building. Once the brick was removed, the exposed concrete masonry backup was inspected, repaired or replaced where necessary and parged to create a suitable surface for the new air and moisture barrier.
An uninterrupted air and moisture barrier was applied to the masonry backup to form the building’s primary weather-control layer. Anchor brackets were attached to the existing structure to support the new façade, and a continuous layer of noncombustible mineral wool insulation was installed outside the air barrier. This approach improved continuity of the insulation while helping protect the underlying weather barrier.
The Argeton support system used aluminum framing channels and clips to secure the kiln-fired terracotta tiles. The subframing created an open cavity behind the cladding for drainage and ventilation. Any incidental moisture entering through the panel joints could drain from the assembly, while airflow through the cavity promoted drying behind the exterior tiles.
This layered assembly addressed several of the weaknesses identified in the original brick veneer. The completed façade provides a distinct outer cladding layer, a drained and ventilated cavity, continuous insulation, and an uninterrupted air and moisture barrier over the repaired backup wall.
Preserving the Low Center’s Architectural Character
Although improved façade performance was the project’s primary objective, the replacement system also needed to respect the appearance and scale of one of RPI’s most recognizable campus buildings. The selected terracotta colors reference the building’s original masonry while incorporating tones inspired by local bluestone.
The new façade creates a more consistent and contemporary expression through clearly defined terracotta tiles and carefully coordinated joints. Its natural clay material preserves the visual weight associated with masonry without recreating the same type of brick veneer that had experienced extensive deterioration.
By balancing color, module size, joint layout and building scale, the project team retained the Low Center’s strong campus presence while giving it a renewed architectural identity.
Coordinating a Multiphase Recladding Project
Once the Argeton system was selected, the building team collaborated closely with Telling’s technical personnel to refine façade details, installation procedures and construction sequencing. The project was completed in phases so that the Low Center could remain occupied and operational during the work.
This required careful coordination of material orders, manufacturing, delivery and installation. Each phase also needed to connect properly with completed and future portions of the rainscreen assembly. Close collaboration among RPI, architecture+, VMJR Companies, Telling and the installation team helped the project maintain its technical requirements, schedule and budget.
Arien S. Cartrette, AIA, of architecture+, described the importance of that coordination:
“Strong partnering between the Owner, Contractor, Telling and the Architect was necessary on this ongoing project due to the complexities of the building and the multiphased schedule involving an occupied building. It is inspiring to have a technically proficient partner in Telling who understands and contributes to the design and engineering process while making the ordering, manufacturing and delivery process flow smoothly.”
Victor Macri of VMJR Companies also commented on the selection process and completed installation:
“We wanted the best overall system, and Telling scored highest. The quality of tile, the precision-engineered aluminum and the support of Argeton, a Wienerberger company, put Telling ahead. We required a low-maintenance, high-quality system, and Telling presented the most competitive price as well. The decision-making process has paid dividends to the university. It looks great and has stayed within budget.”
The Completed Terracotta Recladding Project

The recladding of the George M. Low Center demonstrates how a back-ventilated terracotta rainscreen can be used to address widespread masonry failure on an existing institutional building. Rather than simply replacing the deteriorated brick with another barrier-style veneer, the project team developed a layered façade that separates the exterior cladding from the primary air, water and thermal control systems.
The Argeton system provided the natural appearance of clay at a weight compatible with the existing structure. Its ventilated cavity, continuous mineral wool insulation, engineered aluminum subframing and kiln-fired terracotta tiles created a durable exterior assembly designed around moisture management, thermal performance and long-term serviceability.
The completed façade gives the Low Center a modern, uniform appearance while complementing the colors and materials found elsewhere on the RPI campus. More importantly, it provides a carefully engineered response to the conditions that caused the original brick veneer to fail.
Frequently Asked Questions About Terracotta Rainscreen Cladding
Can a terracotta rainscreen be installed on an existing building?
Terracotta rainscreen can be used to re-clad an existing building when the structure and backup wall are evaluated and prepared to receive the new system. The process may involve removing the existing cladding, repairing the backup wall, installing a continuous air and moisture barrier, adding exterior insulation and attaching an engineered subframing system. At the Low Center, the existing brick veneer was removed before the new Argeton assembly was installed over the repaired masonry backup.
Is a terracotta rainscreen lighter than traditional brick veneer?
Terracotta rainscreen systems can weigh substantially less than conventional anchored brick masonry, depending on the selected panel and wall assembly. The Argeton system used at the Low Center weighed approximately 11 pounds per square foot, making façade weight an important advantage for this recladding project. Final system weights and structural requirements should always be confirmed for the specific product, panel format and building conditions.
How does a terracotta rainscreen help prevent moisture problems?
A back-ventilated terracotta rainscreen separates the outer cladding from the building’s primary air and moisture barrier. Water passing through the open panel joints enters a cavity where it can drain, while ventilation promotes drying behind the tiles. This layered approach helps prevent moisture from becoming trapped within the wall assembly.
Can exterior insulation be added during a rainscreen recladding project?
A recladding project can provide an opportunity to install continuous insulation outside the existing backup wall. At the Low Center, noncombustible mineral wool insulation was installed over the air and moisture barrier and behind the ventilated terracotta cladding. Continuous exterior insulation can improve thermal continuity and reduce heat transfer through elements of the existing wall.
Why use terracotta instead of replacing failed brick with new brick?
Terracotta rainscreen can preserve the natural appearance of fired clay while providing a drained, ventilated and mechanically attached façade. It also offers larger panel formats, a defined cavity and compatibility with continuous exterior insulation. For the Low Center, these characteristics provided a lightweight alternative that addressed the causes of the original brick veneer’s deterioration while maintaining an appropriate masonry character.
Is a terracotta rainscreen suitable for cold climates?
Terracotta rainscreen can be used in cold climates when the complete wall assembly is properly designed for local environmental conditions. Kiln-fired terracotta panels, a drained and ventilated cavity, continuous insulation and an appropriate attachment system help the façade manage precipitation, temperature changes and freeze-thaw exposure. Project-specific engineering and detailing remain essential.
How long does a terracotta rainscreen façade last?
The Argeton terracotta rainscreen system is designed to last for the life of the building. Its kiln-fired terracotta tiles and precision-engineered aluminum subframing provide a durable exterior façade without coatings or finishes that need to be routinely reapplied or replaced.
Does a terracotta rainscreen require maintenance?
Argeton is considered a zero-maintenance terracotta rainscreen system. Its tiles and supporting components will not burn, harden or wear out over time, helping to provide a low cost of ownership throughout the life of the building.
What should architects consider when specifying a terracotta rainscreen for recladding?
Architects should evaluate the condition and capacity of the existing structure, allowable façade weight, air and moisture control, insulation requirements, attachment locations, panel sizes, movement joints, openings and transitions to adjacent materials. Construction sequencing is also critical when recladding an occupied building. Early collaboration with the rainscreen supplier, structural engineer, building-envelope consultant and installer can help identify conflicts before construction begins.
What technical support does Telling provide for terracotta recladding projects?
Telling Architectural Systems works with architects, engineers, contractors and installers to integrate Argeton terracotta rainscreen into new and existing buildings. Support can include panel selection, tile-layout coordination, subframing development, project-specific details, quantity planning, installation sequencing and field guidance. For the Low Center, Telling participated in the design, engineering, ordering, manufacturing and delivery process for the multiphase recladding project.